Connecting a large new load
A 100 MW load at Norwood
You want 100 MW of electrified process heat at Norwood, running by 2029.
EECA counts about 495 MW of fossil fuelled heat in Canterbury that could move to electricity like this.
Transpower Transmission Planning Report 2026, EECA Regional Heat Demand Database
Open the Norwood card to see the evidence →The load as you add it
1Size100 MW
2Kind of loadElectrified process heat
3When it runs hardestWinter
4Running by2029
A worked example from public data. It is a screen, not a connection offer.